The White Glove Pro NW1–NW11 & surrounding areas

After builders cleaning in North West London

From £30 an hour per cleaner · Free site visit before we quote · NW1–NW11

A builder’s clean and a deep clean are not the same job. Construction dust is finer than household dust, it is still falling for days after the last cut is made, and it carries things a normal clean never meets — plaster splash, adhesive residue, silicone smears and paint on glass. We price it by the hour and we come and look first, free, because no honest fixed price survives contact with a real site.

What it costs

£30 an hour per cleaner. The hours below are what our booking calculator uses, and the range allows for how much debris is actually there. Nothing starts until we have seen the property and confirmed the figure with you.

PropertyTypical cleaner-hoursEstimated range
Studio or one room6£155 – £205
One bedroom8£205 – £275
Two bedroom11£280 – £380
Three bedroom14£355 – £485
Four bedroom18£460 – £620
Five bedroom or larger22£560 – £760

These are estimates and we say so plainly. A flat that has been decorated and dust-sheeted throughout can come in under the bottom of its range; one where a wall has come out and a kitchen has gone in can go over the top of it. The site visit is what turns the estimate into a price.

Why builders’ dust is not ordinary dust

Two things make it different. The first is how small it is: the fraction that matters is too fine to see in normal light, which is why a room can look finished and still coat a dark worktop overnight. The second is what is in it. Brick, concrete, mortar, tile and some plasters contain silica, and the Health and Safety Executive describes respirable crystalline silica as the biggest risk to construction workers after asbestos.

None of that makes a finished flat unsafe to live in. It does explain why dry-sweeping a site with a broom mostly moves the problem into the air, and why this is work worth having done rather than doing yourself on a Saturday.

Why we clean in two or three stages

Because fine dust keeps settling. Clean a property end to end in one pass and there is a film back on the surfaces by the next morning — not because the clean was poor, but because the air was still full when it was done.

  • Stage one — the bulk. Debris, dust sheets, protective film, the heavy deposits on floors and sills, and everything high: tops of doors, frames, pipework, light fittings and the ledges nobody looks at
  • Stage two — what has fallen since. The pass that catches the settling, plus the detail work: paint spots, adhesive, grout haze, silicone smears, sawdust in window tracks, hinges and runners
  • Stage three — the finish, on bigger or dustier jobs. Glass, sanitaryware, kitchen interiors and floors brought to a state you would hand over to a tenant or move into yourself

How many stages a job needs is decided at the site visit, not afterwards.

What comes off, and what we will not attempt

Removed as part of the job:

  • Plaster splash and plaster dust, including the film on glass that only shows at certain angles
  • Paint spots on glass, hard floors, sanitaryware, sockets and switch plates
  • Adhesive and tape residue from protective film, masking and packaging
  • Silicone smears around baths, trays, worktops and window frames
  • Grout haze and cement film on new tiling
  • Sawdust and grit in window tracks, runners, hinges and trickle vents
  • Labels and stickers from new units, glazing, appliances and sanitaryware
  • Kitchen and bathroom interiors, cupboards, drawers and appliance cavities

And the honest other half. We do not take away rubble, offcuts or trade waste — that belongs in the builder’s contract, and we clean once the site is clear. We do not do snagging, touching-up or decorating. And we will not take a blade to a surface that will mark: coated glass, some laminates and powder-coated frames get a different method or an honest “that is damage, not dirt”. You will hear which at the site visit rather than after the event.

Who we do this for

Three jobs, mostly. Homeowners at the end of a refurbishment, who want to move back into a finished house rather than a dusty one. Landlords and letting agents turning a property round after works, where the clean sits between the builder leaving and the check-in — often alongside an end of tenancy clean for the next tenant. And builders and contractors who would rather hand over a finished job than leave their own team scrubbing on the last afternoon.

Where we do after builders cleans

Across NW1 to NW11 — Camden and Primrose Hill, Hampstead, Belsize Park and Swiss Cottage, St John’s Wood and Maida Vale, West Hampstead, Kilburn, Brondesbury and Queen’s Park, Cricklewood and Childs Hill, Willesden, Kensal Rise and Kensal Green, Golders Green and Temple Fortune.

Our cleaners are employed, not sent by an agency, and the same team stays on a job from the first stage to the last — which matters more here than anywhere, because whoever did stage one knows exactly where the dust hides.

Book a free site visit

Tell us where it is and what has been done, and we will come and look. You get the hours, the stages and the price in writing before anything is booked.

Common questions

How much does after builders cleaning cost?
It is charged by the hour — £30 an hour per cleaner — because debris levels are impossible to judge from a description. As a guide, a one-bedroom flat is usually around eight cleaner-hours and a three-bedroom house around fourteen. We come and look first, free, and confirm the figure before anything starts.
Why not just quote a fixed price like a deep clean?
Because two flats of the same size can be a day apart in work. One has been decorated and dust-sheeted; the other has had a wall out, a new kitchen in and six weeks of open-window brick dust settling on everything. A fixed price would mean guessing high to be safe, and you would be paying for the guess.
Why does it take two or three visits?
Fine dust stays airborne for hours and keeps settling after the work stops. Clean everything in one pass and a film is back on the surfaces by the next morning. Stage one takes out the bulk, stage two catches what has fallen since, and the final stage is the finish you actually move back into.
Is builders' dust dangerous?
The fine fraction of it is. Brick, concrete, mortar, tile and some plasters contain silica, and the HSE calls respirable crystalline silica the biggest risk to construction workers after asbestos — partly because the particles that matter are too fine to see in normal light. It is a reason to have it done properly rather than dry-swept about with a broom.
Do you take the rubble and the offcuts away?
No — that is the builder's job and it should be in their contract. We clean what is left once the site is clear. If there is still waste on site when we arrive we will say so rather than clean around it.
Can you get paint spots off glass and floors?
Usually. Emulsion and most gloss come off glass and hard floors with the right blade and solvent. What we will not do is take a blade to something that will scratch — coated glass, some laminates, powder-coated frames — and we will tell you which is which at the site visit rather than after the event.
How soon after the builders finish can you come?
As soon as the site is clear and the dust has stopped being made. If trades are still coming and going it is worth waiting, because anything cleaned before the last cut is made will need doing again.
Do you cover flats as well as whole houses?
Yes — single rooms, flats, whole houses and communal areas across NW1 to NW11. A one-room refurbishment is a perfectly normal job and is priced the same way, by the hour.

Hourly rate and the cleaner-hour figures on this page are the ones used by our own booking calculator. The description of respirable crystalline silica, and its ranking as the largest risk to construction workers after asbestos, is the Health and Safety Executive’s, from its construction health risks guidance (hse.gov.uk, read September 2026). Every estimate on this page is confirmed at a free site visit before work starts.